Ensuring a hospital has an uninterrupted supply of potable water.
THE CHALLENGE
In periods of interrupted municipal supply, Barberton Hospital, South Africa, needed to be able to turn to its borehole to ensure a continuous supply of potable water
OUR SOLUTION
In order to achieve the client’s goals quickly and cost effectively, PROXA designed, commissioned and installed a packaged treatment plant that would clean and sterilise the borehole water to potable standards.
HOW PROXA ADDED VALUE
PROXA went to great lengths to ensure that the client had continual, on specification water during periods of interrupted municipal water supply.
FEED WATER
Borehole water
PRODUCT WATER
Potable water
PERFORMANCE TARGET
2.5 m3/hour
PROCESS
Filtration
FUV Disinfection
Client: Barberton Hospital